Finishing the scratch build of a bridge and scenic work on the baseboard: Elvenhome EP 152

Описание к видео Finishing the scratch build of a bridge and scenic work on the baseboard: Elvenhome EP 152

In this video of my N Gauge Model Railway layout Elvenhome, I show some work I have been doing on the baseboard that I hadn't intended to do using products form the Original Metal Sign company (link below). I also reveal the outcome of the chimney pot poll in the last video and show the first row of terraced houses repotted. Finally I show the work I have been doing toe complete the bridge that spans between Sharky's end and High elven and how I am going to allow the track to split if I need to remove the board on which High Elven stands.wrestle with creating a curved bridge support from a single piece of square evergreen styrene tube. I also discuss some possible replacement chimneys for my Metcalfe buildings. My new Graham Farish Standard 5MT loco gets a second chance to star in the running session alongside the LNER O6 (8F)

The link for the company (this is not an affiliate link) from which I bought the metal signs you see in the video is https://originalmetalsigns.co.uk

Комментарии

Информация по комментариям в разработке