Tangenvika project

Описание к видео Tangenvika project

First driven pile installed on Tangenvika Project! And what a pile it is… 85m long, 1,430mm diameter with a net weight of 102t… lifted and installed in one piece! Keller Geoteknikk AS continuous to work at Tangenvika Project despite the outside temperature reaching -28°C.

Subscribe: https://bit.ly/2ImjDkD

Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector – from industrial and commercial to housing, infrastructure and environmental projects.

#KellerGroup #Geotechnical

Website: https://www.keller-geoteknikk.no/ or https://www.keller.com/
LinkedIn: https://bit.ly/2IrtmGU

Keller Group on YouTube:
   / kellergroup  

Комментарии

Информация по комментариям в разработке