What's Below in the Welland Canal.. Winter Maintenance 2023

Описание к видео What's Below in the Welland Canal.. Winter Maintenance 2023

What happens on the Welland Canal during the winter? The St. Lawrence Seaway Authority starts this winters maintenance by emptying the canal between Locks 1 and 7 to repair and maintain the physical infrastructure. The Canal is closed to shipping between January 7th and March 22nd and this enables work crews to carry on without having to schedule around any ships going through the canal.

Watch our next video which will be in Port Colborne and visiting all the vessels that are on winter layover.

Here are the NIAGARA SCENES link to the vessels shown in this video:

HAPPY RIVER:

   • Heavy Lift Cargo Ship HAPPY RIVER Tra...  

INDUSTRIAL SKIPPER:

   • Heavy-Lift Cargo Ship INDUSTRIAL SKIP...  

QIQIKTAALUK W:

   • Chemical/Oil Tanker QIKIQTAALUK W Pas...  

J ARNOLD WITTE:

   • Tugboat J ARNOLD WITTE Heads for the ...  

IVER BRIGHT:

   • Asphalt/Bitumen Tanker IVER BRIGHT De...  

Watch more videos of vessels on the Welland Canal at NIAGARA SCENES:

   / @niagarascenes  

Комментарии

Информация по комментариям в разработке