How to build indoor multipurpose sports facility? (2.000 attendance capacity)

Описание к видео How to build indoor multipurpose sports facility? (2.000 attendance capacity)

What are the construction stages of an indoor sports hall?

The first step in the construction of an indoor sports hall is the concrete, iron and mold works required for the infrastructure. Simultaneously, steel construction manufacturing is carried out in the factory environment. After the infrastructure works are completed, the steel construction is assembled on the site and then the exterior cladding work is done. At this stage, the tribune, living areas, lighting and ventilation works are carried out simultaneously in the hall. After these works are completed, the flooring of the playfield is done and the sports equipment is installed.

How much will the indoor sports hall construction cost in 2020?

Indoor #sports #hall cost varies according to the capacity of the tribune, the size of the playfield, and the living spaces.

For more information : https://integralspor.com/sports-facil...

Комментарии

Информация по комментариям в разработке