Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level

  • MegaVerse Builds
  • 2026-02-15
  • 988
CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level
camp nouCamp Nou 2025Spotify Camp NouCamp Nou constructionCamp Nou updateCamp Nou progressCamp Nou renovationCamp Nou new designCamp Nou rebuildBarça stadiumEspai Barçanew Camp NouCamp Nou latest updateBarcelona new stadiumCamp Nou construction progressCamp Nou 2026camp nou exterior progressstadium facade installationbarcelona mega projectespai barca construction sitecamp nou structural updateespai1234abcfcbreal madridbernabeu
  • ok logo

Скачать CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео CAMP NOU BREAKTHROUGH: 4TH RADIAL BEAM INSTALLED | Slats Nearly Complete & Cantilever Level

After two days of heavy rain and wind alerts, construction has returned with full intensity — and the results are massive. The fourth radial beam and compression ring pillar are now installed in the Lateral section, marking a major structural milestone for the future roof system.

In this update, we break down:

• The installation of the 4th radial beam
• Rapid sandwich panel progress reaching the first cantilever level
• Near-completion of key corner slat sectors
• Ongoing elevator core advancement in Tribuna
• North Goal developments amid reopening discussions

The façade transformation is accelerating, and the stadium’s final geometry is becoming more visible each week.

Subscribe to MegaVerse Builds for daily Camp Nou construction updates and don’t miss this historic transformation.




🔴 COPYRIGHT DISCLAIMER
MegaVerse Builds does not fully own the material featured in this video.
All credit goes to the original owners, and we use content under Section 107 of the Copyright Act 1976 — "fair use" for purposes like commentary, news reporting, teaching, and research
📩 If you own any of the footage used, please let us know in the comments — we’ll follow your request immediately.



#CampNou
#SpotifyCampNou
#FCBarcelona
#CampNouUpdate
#StadiumConstruction
#Barca
#CampNouRenovation
#MegaVerseBuilds
#Barcelona
#StadiumUpdate#CampNou
#SpotifyCampNou
#FCBarcelona
#CampNouUpdate
#StadiumConstruction
#Barca
#CampNouRenovation
#MegaVerseBuilds
#Barcelona
#StadiumUpdate

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]