Secant or Tangent Piles Animation | Keller

Описание к видео Secant or Tangent Piles Animation | Keller

Secant or tangent piles are columns constructed adjacent (tangent) or overlapping (secant) to form structural or cutoff walls. The columns are constructed using soil mixing, jet grouting, auger cast, or drilled shaft methods. Secant or tangent pile walls can be constructed in a wide variety of soil conditions, including through cobbles and boulders.

Subscribe: https://bit.ly/2ImjDkD

Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector – from industrial and commercial to housing, infrastructure and environmental projects.

#KellerGroup #Geotechnical

Website: https://www.keller.com/
Twitter: https://bit.ly/2ShUrMC
Facebook: https://bit.ly/2E2SqP9
LinkedIn: https://bit.ly/2IrtmGU

Keller Group on YouTube:
   / kellergroup  

Комментарии

Информация по комментариям в разработке