4K Airport Tour : Dubai International Airport Terminal 3 مطار دبي الدولي (Dubai, UAE) / Walk 204

Описание к видео 4K Airport Tour : Dubai International Airport Terminal 3 مطار دبي الدولي (Dubai, UAE) / Walk 204

WATCH NEXT : An evening walk into an old nostalgic Dakota Crescent HDB estate :    • 4K Rain Walk : Nostalgic Singapore: D...  

Here is a list of my gear :
DJI Osmo Pocket 2 : https://amzn.to/3gjZRXc
Zoom H5 Sound Recorder : https://amzn.to/3x5jdoz
Sandisk 256GB Micro USB : https://amzn.to/3amcLjz
Boya MM1 Microphone : https://amzn.to/3gjLiCP
Sennheiser Ambeo Binaural Microphone : https://amzn.to/2QC8p0r
Wanderlust : A History of Walking : https://amzn.to/2OWArDw

Dubai International Airport (IATA: DXB, ICAO: OMDB) (Arabic: مطار دبي الدولي‎) is the primary international airport serving Dubai, United Arab Emirates, and is the world's busiest airport by international passenger traffic.It is also the fifth-busiest airport in the world by passenger traffic, the sixth-busiest cargo airport in the world, the busiest airport for Airbus A380 and Boeing 777 movements, and the airport with the highest average number of passengers per flight. In 2017, DXB handled 88 million passengers and 2.65 million tonnes of cargo and registered 409,493 aircraft movements. In July 2019, Dubai International airport installed the largest solar energy system in the region's airports as part of Dubai's goal to reduce 30 percent of the city energy consumption by 2030.

Support me on Ko-fi! : https://ko-fi.com/ambientwalking
Check out my merch : https://society6.com/ambientwalking

https://en.wikipedia.org/wiki/Dubai_I...

Dubai International Airport is situated in the Al Garhoud district, 2.5 nautical miles (4.6 km; 2.9 mi) east of Dubai and spread over an area of 7,200 acres (2,900 ha) of land. Terminal 3 is the second-largest building in the world by floor space and the largest airport terminal in the world.

Emirates Airline has its hub airport in Dubai International (DXB) and has their own terminal 3 with 3 concourses that they share with flydubai. The Emirates hub is the largest airline hub in the Middle East; Emirates handles 51% of all passenger traffic and accounts for approximately 42% of all aircraft movements at the airport. Dubai Airport is also the base for low-cost carrier flydubai which handles 13% of passenger traffic and 25% of aircraft movements at DXB. The airport has a total capacity of 90 million passengers annually. As of January 2016, there are over 7,700 weekly flights operated by 140 airlines to over 270 destinations across all inhabited continents. Over 63% of travelers using the airport in 2018 were connecting passengers.

The history of civil aviation in Dubai started in July 1937 when an air agreement was signed for a flying boat base for the aircraft of Imperial Airways with rental of the base at about 440 rupees per month—this included the guards' wages.[citation needed] The Empire Flying Boats also started operating once a week flying east to Karachi and west to Southampton, England. By February 1938, there were four flying boats a week.[citation needed]

In the 1940s, flying from Dubai was by flying boats operated by British Overseas Airways Corporation (BOAC), operating the Horseshoe route from Southern Africa via the Persian Gulf to Sydney.

Dubai International Airport was conceptualised to function as Dubai's primary airport and the region's busiest for the foreseeable future without the need for relocation or the building of another airport when passenger figures increased. The area was chosen near to Dubai, to attract passengers from the city of Dubai, rather than travel to the busier Sharjah International Airport. The planned location originally was Jebel Ali.

The original master plan for the existing airport initially involved a dual-terminal and one runway configuration over two phases with provisions for another two passenger terminals in the near future. Phase 1 included the construction for the first passenger terminal, the first runway, 70 aircraft parking bays, support facilities and structures, including a large maintenance hangar, the first fire station, workshops and administrative offices, an airfreight complex, two cargo agents' buildings, in-flight catering kitchens and a 87 m (285 ft) control tower. Construction for the second phase would commence immediately after the completion of Phase 1 and include the second runway, 50 new aircraft parking bays in addition to the existing 70 bays, a second fire station and a third cargo agent building.

The third phase included construction of a new terminal (now the parts of Terminal 1's main building and Concourse C) and an additional 60 parking bays, as well as new aircraft maintenance facility. Then, in the early 2000s (decade) a new master plan was introduced which began the development of the current concourses and terminal infrastructure.

Paul Griffiths (Dubai Airports' CEO) in his interview to Vision magazine, cited plans to build infrastructure to support the expansion of Emirates and budget airline flydubai, and ascend the ranks of global aviation hubs.

Комментарии

Информация по комментариям в разработке