Deadweight Calculation and Stowage Plan | Loadicator | Part 4 |

Описание к видео Deadweight Calculation and Stowage Plan | Loadicator | Part 4 |

For example no 1 to which this video refers to :    • Deadweight Calculation and Stowage Pl...  

This video shows how to go about the Pre-Stowage plan using the loadicator basis the Deadweight Calculations after the Voyage instructions are received onboard Bulk Carriers. The video is Part 4 of the series of 9 videos which will be released on the same topic covering different situations and voyages and will explain all the aspects of Cargo planning onboard Bulk Carriers.

This series aims to cover all three aspects -
1. Performing Deadweight Calculations
2. Tendering a Stowage Plan
3. Devising a Loading sequence.

This video teaches Step No 2 explained on the basis of Example no 1 Voyage (Ust luga - Dunkirk-Ghent). Future videos will cover the other steps basis different voyage examples.

Team funnel2tunnel.com

Follow us on -
Web: www.funnel2tunnel.com
Facebook:   / funnel2tunnel  
Linkedin:   / funn.  .
Twitter:   / funnel2tunnel  
Instagram:   / funnel2tunnel  
Youtube: https://www.youtube.com/channel/UC711...

Комментарии

Информация по комментариям в разработке