Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction

  • Encon Construction
  • 2022-07-19
  • 208
Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction
  • ok logo

Скачать Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Hartcliffe Way Household Reuse & Recycling Centre, Bristol - Construction

Showcasing our #Bristol Hartcliffe Way Reuse & Recycling Centre project – Now open! The contract was delivered in partnership with Bristol Waste Company, Bristol City Council and SLR Consulting.

The new facility will offer access for people walking and cycling to it, as well as driving, and is home to one of the largest Reuse Shops and workshops in the region; selling and repairing good quality, pre-loved items that might otherwise have gone to waste. A specially commissioned 'mega bug hotel sculpture' has been installed, made by local scenic sculptor Jonny Mann, to provide a haven for wildlife, and will also help encourage native wildlife and flowers to repopulate the banks surrounding the centre.

Civil engineering and building works included:
· Site Clearance & Earthworks; Bulk earthworks & Filling
· Installation of new under-ground Storm & Foul water drainage, including attenuation features and flow controls
· Installation of new under-ground Mains Services and associated services ducting
· Construction of improved site access including a new bridge over the existing water-course ‘Pigeonhouse Stream’ (North Bridge – access)
· Construction of a dedicated site exit including a new bridge over the existing water-course ‘Pigeonhouse Stream’ (South Bridge – exit)
· Highways 278 Works along the existing adjacent A3029 Hartcliffe Way
· Construction of new RC Walls to form split-level site areas, and material storage bays
· Installation of new Weighbridge
· Construction of new site hard-stand areas, car-parking & site circulation roads of concrete and tarmacadam
· Construction of new steel-framed Re-use Building & associated works including internal fit-out and M&E installations

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]