Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING

  • Civil Outsourcing - Civil and Land Survey
  • 2025-06-26
  • 47
HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING
CIVIL ENGINEERING OUTSOURCINGcivil 3d expert outsourceoutsourcing civil engineering servicesservices of civil engineeringcivil engineering draftingcivil 3d drafting servicescivil engineeringengineeringoutsourcing drafting servicescad drafting servicesauto cad servicesoutsource drafting servicesoutsource cad servicesoutsource autocad draftingoutsourcing engineering servicescivil drafting outsourcingcivil 3d draftingcivil engineering companies
  • ok logo

Скачать HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS | CIVIL OUTSOURCING

HOW DID WE SUCCEED IN DELIVERING 103 ACRE LAND DEVELOPMENT PROJECT WITH 287 LOTS

STATUS/ COUNTRY: Illinois, USA
AREA: 103 AC
RESIADENT LOTS: 287
PROJECT SUMARY:
The project is scheduled for completion in early 2022. It is divided into three phases:
• Phase 1 includes 96 lots and the West Pond.
• Phase 2 is designed with 108 lots.
• Phase 3 comprises 83 lots and the South Pond.

STEP 1: ANALYSIS OF EXISTING SITE CONDITIONS:
At the southern boundary of the site, there are existing wooded areas that need to be preserved in order to minimize disturbance to the natural environment.
Additionally, a drainage channel serving the upstream catchment area crosses the site from south to north.
This requires us to propose a solution that ensures the protection of the shared drainage corridor for the upstream flow.

STEP 2: PROPOSED SITE LAYOUT AND SOLUTIONS INCORPORATION INTO EXISTING CONDITIONS:
The proposed site layout has been developed, incorporating a 40-foot stormwater easement to convey runoff to the wet detention pond.
Rainwater is directed to the wet pond, where it is retained before being discharged to the existing river located at the northern boundary of the project site.

STEP 3: FINAL GRADING MODEL BY CORRIDOR AND FEATURE LINE.
We have successfully completed the grading model for Phase 1, connecting internal roadways within the project to the existing roads.
The elevation of roads, curbs, swales, and pad levels has been finalized, with careful design of longitudinal and cross grade.
A maximum slope of 5% is maintained for driveways connecting from the road to private garages.
Swales are strategically placed around houses to collect stormwater and direct it to the project's common drainage system.

STEP 4: CREATE UTILITIES SYSTEM MODEL BY PIPE NETWORK AND PRESSURE PIPES.
We have developed the stormwater, water supply, and wastewater modeling systems for the project.
Accurate layout planning and elevation control from the early design stage have contributed significantly to the overall success for our client
especially at traffic intersections, where multiple utility systems intersect within a limited space.


STEP 5: FINAL GRADING PLAN:
We present all design information and concepts clearly on each sheet and submit them to the client.
Here, we strictly follow the client's standards for line styles, line weights, plot styles, and text styles.
We are always careful to double-check the accuracy of design elevations displayed on the sheets,
as these reflect the dedication of each engineer ensuring that their work conveys complete and consistent information across the entire project.

STEP 6: PLAN & PROFILE SHEETS:
A critical part of the project is presenting the plan and profile views on the sheets.
In our workflow, we include detailed annotations such as server information, stationing, and offsets.
Particularly, we highlight the minimum cover for water pipes, as well as the length and slope of the pipe network.

STEP 7: CREATE CUTFILL REPORT:
The Cut/Fill Map is one of the services we regularly provide to our clients.
It serves as a critical reference for all earthwork-related activities on the project.
In addition, we deliver accurate volume calculations tailored to each design phase, helping clients plan and allocate resources effectively.

✅ Need a Partner Who Can Handle Complex Land Development Projects Like This One?
At Civil Outsourcing, we don’t just deliver drawings — we deliver fully thought-out solutions from site constraints to utility conflicts, grading, and cut-fill optimization.
Just like we did with this 103-acre, 287-lot residential project in Illinois, broken into 3 phases — from preserving natural drainage corridors to modeling utility systems at tight intersections, we handled it all.

👉 Let us help you speed up your land development projects with precision, quality, and peace of mind.
📩 Contact Civil Outsourcing today via email: [email protected]

----------------------------------
Civil Outsourcing - Civil Engineering And Land Survey
🔹 Website: https://civiloutsourcing.com/
🔹 E-mail: [email protected]
#Aidedo #AutodeskCivil3D #civiloutsourcing #civilengineering

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]