This is a great example of load shaving and using the system controller

Описание к видео This is a great example of load shaving and using the system controller

3 Phase #Sunsynk inverter system Program to load shave when the total wattage of the building exceed 7.5 kW inverter will start to discharge the battery, If the power is below that then I can charge the battery.
In addition, we have a Solar array connected to the system.
The system was installed on commission by #TB electrics in Warrington

Keith is at AQUACUT in Warrington UK looking at a system employing Sunsynk inverters which are set in a Master / Inverter A / Inverter B pattern while in parallel to handle ‘phase rotation’. This is an On-Grid set-up with 900Amp batteries included in the system. With this type of system the company is handling a Peak Power Demand which they achieve by taking a) power from a 25kW solar array and b) grid power taken from the grid between 0100-0500hrs ; when the tariff is low. When the solar panels are producing power the system is set for Zero Export so that the power generated goes to the Load. Any surplus power is shaved off and sent to the batteries for use later. The whole system is highly efficient with each inverter handling 26.7kWh of power and this is shown under ‘Solar Production’ on the LCD display. Together, the whole system is producing 76kWh from a 25kW solar array, which is very impressive!

Комментарии

Информация по комментариям в разработке