Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Load cell and other force calibrations may have high ISO17025 risk (why 4:1 TUR is not enough).

  • Morehouse Instrument Company
  • 2019-05-16
  • 840
Load cell and other force calibrations may have high  ISO17025 risk (why 4:1 TUR is not enough).
T.U.R.TUR4:1 TURGuardbandingISO 17025 RiskPFAProbability of False AcceptForce MeasurementForce CalibrationLoad Cell RiskLoad CellIs my force equipment in tolerance
  • ok logo

Скачать Load cell and other force calibrations may have high ISO17025 risk (why 4:1 TUR is not enough). бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Load cell and other force calibrations may have high ISO17025 risk (why 4:1 TUR is not enough). или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Load cell and other force calibrations may have high ISO17025 risk (why 4:1 TUR is not enough). бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Load cell and other force calibrations may have high ISO17025 risk (why 4:1 TUR is not enough).

Why a 4:1 TUR is not enough:
The importance of analyzing the probability of false accept risk

Several organizations and publications reference or insist on maintaining a 4:1 Test Uncertainty Ratio (TUR) without understanding the level of risk that they may be subjecting themselves to. The general thought is if the lab performing the calibrations has standards at least four times better then what they are calibrating that everything is good. This webinar discusses TUR, PFA Risk, and why the location of the measurement matters. We will discuss two managed risk guard banding methods (5 & 6) found in the ANSI/NCSL Z540.3 Handbook. We will show that a 4:1 TUR is not enough and can result in a 50 % risk. This webinar is intended for anyone thinking a 4:1 TUR or TAR is enough as we will prove that thought process to be somewhat flawed. Others wanting to know more about risk should also attend.

Learning Objectives:

*The webinar attendee will understand that a 4:1 TUR & 4:1 TAR is not enough when analyzing risk

*The webinar attendee will learn more about the role measurement uncertainty makes in making statements of conformance

*The webinar attendee will know the importance of the location of the measurement and leave with a basic understanding of guard banding

For free excel tools, papers, and other articles on better metrology practices, please visit https://mhforce.com/documentation-tools/


#testuncertainty
#metrology
#metrologyeducation
#tur
#force
#forcecalibration
#morehouse

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]