Geothermal drilling - this is how it’s done. Heizungsmacher shows in this video step by step how a geothermal drilling proceeds. In the first step, a huge drilling machine is placed on the site of the builder. Using a drill rig with a diamond drill head attached to the end, a water/air mixture is pumped 220 metres into the ground via a double pipe string. In the process, soil, rock and bedrock are conveyed to the surface through the inner casing of the drill pipe and pumped out. As soon as the final depth is reached, the drill pipe is pulled out again and instead a so-called pipe bundle is inserted into the drilled hole. After the installation of the geothermal heat pump, this pipe bundle transports the heat from the ground to the heat pump. Finally, the borehole is backfilled with a concrete mix and the heat pump can be connected to the geothermal probe and put into operation.

▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

Content:
00:00 Intro
00:15 Ideal location of the drilling point
00:45 Installation geothermal drilling
01:18 Start of the construction process
01:45 Set auxiliary piping
02:04 Normal drill pipe is used
02:37 Pulling out the drill rods
02:45 Prepare and sink geothermal probe pipes
03:17 Check functionality
03:26 Backfilling the borehole
03:44 Completion of the work
03:57 Create line trench and supply lines

▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

More useful videos and links:
📚 Heizungsmacher Knowledge Page: https://www.heizungsmacher.ch/wissen/

▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

👋 Subscribe to our channel for more exciting videos:
   / @heizungsmacher   sub_confirmation=1

…..

#Geothermalenergy #geothermaldrilling #Heizungsmacher

Комментарии

Информация по комментариям в разработке