Crap to Cream, Part 22, MGB restoration, fuel, brake and clutch line installation. Take 2

Описание к видео Crap to Cream, Part 22, MGB restoration, fuel, brake and clutch line installation. Take 2

The first video the camera angle wasn't that good. This episode is around the installation of the brake, fuel and clutch copper tubing, plus the live cable from the battery. Small bore copper tube bending is certainly an art form, mine is better than the original but isn't as good as factory. I've installed an oversize positive battery cable which whilst is good for the transportation of electrons it certainly comes with a few challenges fitting it to the original cable tray set up. The clutch pipe connection to the master cylinder is very tight and working with two fixed points certainly had challenges. Still more work to be done here, additional clips and also finishing off the fuel line in the engine bay. The rebuild continues...

Комментарии

Информация по комментариям в разработке