How Indian Railway shift their track in 5 hours block? | Must watch video | DFCCIL

Описание к видео How Indian Railway shift their track in 5 hours block? | Must watch video | DFCCIL

How Indian Railway shift their track in 5 hours block? | Must watch video | DFCCIL

Permanent speed restriction of 75 kmph imposed due to insufficient transition length of curve no. 102, near ETMJ-4, and SEJ (Switch Expansion Joint) laid in transition length.
The existing parameter of curve 102 degree of curve 102 = 2.86, Radius = 613 m.
To relax the speed restriction to normal 100 kmph for new alignment. Radius need to increased upto 700 m and degree 2.5.

#agricultural #railway #railways #track #sand #construction #capital #civil #engineering #engineer #graders #pole #india #indian

‪@pmoindia‬ ‪@IndianRailwaysFan‬ ‪@inbministry‬ ‪@MinistryofRailwaysIndia‬

Комментарии

Информация по комментариям в разработке