Tesla Terafactory Texas Update

Описание к видео Tesla Terafactory Texas Update

Hey guys, it’s Randy! Today’s footage shows the work done over the weekend and throughout most of the day on Monday. We have lots of new concrete poured, wall panels installed, and most notably, two new massive bridge cranes have arrived and are being staged to the north of the factory. There’s a lot to see, so let’s jump right into it.

Here are today’s key takeaways:
- The north end shows the new lot is in the process of having bumper blocks for parking spaces installed. The northern gap shows what looks to be a large concrete slab that has been poured on the ground floor in the distance. Up above, the roof shows that this section is now fully covered with concrete so now they just have to finish applying the membrane to complete this large section of roof.
- The GigaPress area shows the grade beam has been poured and we can now see rebar and forms placed so that this last remaining section at the north end that needs concrete can have it poured. The east side of the building shows that wall panel installation is having possibly the last panel welded into place to complete the installation of panels on this side!
- The east side of the BIW section shows another large concrete section has been poured to the right of the dumpsters and crane area that wasn’t there last week. Further south, we see in the Stamping section that a large slab has been poured and we can see the next section of it in the process of being poured as well.
- The southern gap’s south end shows work on the center row footings and along both sides of the gap are still in progress and we can see that work to bury the center footings is also underway. The north end shows the latest progress of the steel erecting taking place and we can see that they are currently on the eight and ninth sections and show no signs of slowing down.
- The south detention pond is taking on a new shape and we have several areas of activity to fill different parts of the original footprint taking place.
- The southwest corner shows the smooth transition needed where the 2 different types of materials join has been added to the road and just north of here, we can see new work with the drainage pipe on the west side of the road has started.
- The paved asphalt road on the west side we saw in progress has now also been completed. We’ll have to wait to see what they do to fill in the gaps between the new and older road where the barrier is and also traffic lane markings. The installation of the tall row of windows hasn’t progressed since we last saw them, but the smaller windows on the bottom row and the medium sized windows above those have made excellent progress! We can also see work to install the last remaining wall panels in this area is also happening.
- Lastly, we get a look at two massive bridge cranes with Tesla branding on trucks in a staging area awaiting to be moved into the factory. Which area do you guys think these will be going to? Let me know in the comments below!

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

  / terafactorytexas  

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 10-11-21
Time of Day: Late Afternoon - 4:45pm

--------------------------------------------

Social Media

Twitter:   / terafactorytx  
Instagram:   / terafactorytx  

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts -    / peterdog15  
@JoeTegtmeyer -    / joetegtmeyer  
@TxTerafactory -    / texasterafactory  

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin:    / thewolfpackberlin  

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Vital Whales - Unicorn Heads

Комментарии

Информация по комментариям в разработке