एक प्रोडक्शन सुपरवाइजर/ इंजिनियर को क्या-क्या पता होना चाहिए ? प्रोडक्शन डिपार्टमेंट में इस्तेमाल होने वाले सिस्टम ? कैसे एक बेहतर प्रोडक्शन सुपरवाइजर/ इंजिनियर बन सकते है ? प्रोडक्शन सुपरवाइजर/ इंजिनियर से इंटरव्यू में क्या-क्या पूछा जाता है ?
USEFULL Tips- PRODUCTION Supervisor/ Engineer |How to Become a Good Production Supervisor/ Engineer?
Interview Questions for Production Engineer and Production Supervisors
Production supervisor job responsibilities in Hindi
production supervisor interview questions and answers in Hindi

FULL COURSE for Production Supervisor/Engineer | How to Become a Good Production Supervisor/Engineer
   • FULL COURSE for Production Supervisor...  
________
Equipment used:
Mic used for Recording : https://amzn.to/3nEEi4V
Laptop Used for Editing : https://amzn.to/3gUyp2m
Green Screen : https://amzn.to/3aOIvOv
Phones for Making Videos:
https://amzn.to/2SjGVxy
https://amzn.to/33hKwi0

_______
5S Posters : https://amzn.to/3eZ78JH
------
Visit Our Website @ https://www.aytindia.com
AYT India Academy @    / aytindiaacademy  
AYT India FB Group @   / aytindia  
AYT India FB Page @   / aytindiaacademy  
Linkedin @   / shakir-mohd-483a75103  
_____________________________________________________________________
Related Videos:
* What is TPM & TPM 8 Pillars :    • What is TPM & TPM 8 Pillars |TPM -Tot...  
* What is KAIZEN CONCEPT of LEAN :    • What is KAIZEN CONCEPT of LEAN: Conti...  
* What is O.E.E (Overall Equipment Effectiveness):    • What is O.E.E (Overall Equipment Effe...  
* Interview Tips :    • इंटरव्यू और रिज्यूमे में ये 5 गलतिया ...  
* PPT / MS- PowerPoint Classes : https://tinyurl.com/y37eyph5
*5S:    • 5S Concept | What is 5S Methodology |...  
*POKA-YOKE:    • POKA-YOKE | MISTAKE PROOFING | Fool P...  
*Man, Machine, Material Safety Knowledge:    • Safety First  
*Measuring Instruments Knowledge:    • Measuring Instruments & Gauges  
*Red Bin Analysis (RBA):    • Red Bin Analysis (RBA) | रेड बिन एनाल...  
*4M Change Management:    • 4M CHANGE  Management - Introduction ...  
*Machine Maintenance CLIT:    • TPM CLIT Sheet | Jishu Hozen Check-Sh...  
*FIFO & LIFO Concepts :    • Learn FIFO & LIFO Inventory Managemen...  
*Production & Productivity Difference :    • Production vs Productivity | Differen...  
*BOM/ BOQ :    • What is BOM | B.O.M | BOM List Format...  
*Cycle Time :    • (हिंदी में) Takt Time vs Cycle Time v...  
---
Music:
---
Reference:
---
About Myself: Shakir Mohd. (B.TECH)
• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).

Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:

Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
Welcome Footwear, Bahadurgarh
RKP Packers, Delhi
Presto Stantest Pvt., Faridabad
United Cores Private Limited, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
Durga Engineering Works, Faridabad
& Many More