MAJOR MAKEOVER, PILE DRIVING, Thru-Flow decking with a Golden Seadrive boat lift

Описание к видео MAJOR MAKEOVER, PILE DRIVING, Thru-Flow decking with a Golden Seadrive boat lift

This was a major backyard makeover with a 12’6” exposed naval style Everlast Vinyl seawall. The new dock is constructed with 6” Piling’s embedded a minimum of ten feet in the sand. We installed a Golden Sea drive boat lift this lift was installed with straps due to the shallow water.

Комментарии

Информация по комментариям в разработке