Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть The Chenab Rail Bridge | Connecting Kashmir |

  • RS Live
  • 2025-06-08
  • 140813
The Chenab Rail Bridge | Connecting Kashmir |
#rsliverslivenew indiaindiaexpresswaypragatika highwaygati shaktiRRTSBullet trainDFCChenab Rail BridgeThe Chenab Rail BridgeChenab Bridge
  • ok logo

Скачать The Chenab Rail Bridge | Connecting Kashmir | бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно The Chenab Rail Bridge | Connecting Kashmir | или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку The Chenab Rail Bridge | Connecting Kashmir | бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео The Chenab Rail Bridge | Connecting Kashmir |

The Chenab Rail Bridge is a single track railway bridge over the Chenab River in Reasi district of the Indian union territory of Jammu and Kashmir. It is a steel and concrete bridge spanning 1,315 m (4,314 ft) across the river gorge. The structure consists of an approach bridge which is 530 m (1,740 ft) long and a 785 m (2,575 ft) long deck arch bridge. With a deck height of 359 m (1,178 ft) from the river bed, the arch bridge is the highest rail bridge and arch bridge in the world. It is located between Kauri and Bakkal rail stations on the Jammu–Baramulla line.

The Jammu–Baramulla railway project was initiated with the laying of its foundation stone in 1983, but construction commenced only in the mid-1990s after funds were allocated. The project progressed in phases: the Jammu–Udhampur section opened in April 2005, and the Udhampur–Katra section opened in July 2014, with the line set to extend beyond Srinagar to connect with the Baramulla–Banihal section that was completed between 2008 and 2013.

The bridge was constructed at a cost of ₹14.86 billion (US$180 million). The project was overseen by Konkan Railway Corporation of the Indian Railways. The construction work started in 2017, and the base supports were completed in November 2017 with the arch constructed by April 2021. The bridge was fully completed in August 2022, and the first trial runs were conducted in June 2024. The bridge was inaugurated for rail traffic on 6 June 2025.

-----------------------------------------------------------------------------------------------------
Visit our website https://rslive.in/
------------------------------------------------------------------------------------------------------
For business inquiries email me :- [email protected]
------------------------------------------------------------------------------------------------------
आप सभी का बहुत बहुत धन्यवाद.. Thank you for your love

#rslive #RSlive #irslive

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]