Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit)

  • Fairblock
  • 2025-01-28
  • 50
EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit)
  • ok logo

Скачать EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео EVM Integration with Pre-Compiles (Showcase with Arbitrum Orbit)

Welcome to the Fairblock and General EVM Integration (with Pre-Compiles) Tutorial (Time stamps and details below👇🏼)!

This tutorial focuses on presenting the high-level methodologies for integrating Fairblock with EVM Chains using EVM FairyKit. In this video, we cover a more specific EVM FairyKit method, but if you are interested in other integration methods, please feel free to reach out to us on our discord!

This tutorial focuses on the deployment of pre-compiles logic into an EVM, specifically an Arbitrum Orbit chain (L3). The pre-compiles allow developers and traditional EVM smart contracts to integrate with Fairblock Fairyring network, thus unlocking the power of a dynamic confidentiality network.

By the end of this tutorial, developers will:

Part 1: Deploy their own EVM with Fairblock pre-compiles into an Arbitrum Orbit chain that communicates with the Arbitrum Sepolia test network.
Part 2: Deploy and test a Sealed Bid Auction smart contract, written in Solidity, working with the pre-compiles logic from Part 1.
The underlying contracts and scripts will provide developers a sense of the integration process with the Orbit chain pre-compile logic and ultimately Fairblock's testnet, Fairyring.

*TIMESTAMPS*
00:00 - Welcome
00:45 - Agenda
01:23 - What is Fairblock
04:36 - Fairblock Architecture
12:10 - EVM FairyKit Design Options
15:38 - Orbit Tutorial Key Points
18:34 - Code Walk Through
34:24 - Next Steps and Conclusion

For more information, please refer to the below:

Visit the Fairblock website: https://www.fairblock.network/
Visit the Fairblock Docs: https://docs.fairblock.network/docs/w...
Check out and Clone the tutorial repo to follow along: https://github.com/hashedtitan/orbit-... & https://github.com/hashedtitan/nitro/...
Join us on Discord:   / discord  

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]