Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 4) || By Civil Guruji

Описание к видео Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 4) || By Civil Guruji

#civilengineerstraininginstitute #CivilGuruji
Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 4)
Like Share & Subscribe

Registration Open Call :- 9111001234

Application Link :- https://play.google.com/store/apps/de...

Practical Training Detail:-    • Practical Site Training Course, Offli...  

Register Now and Pay Later:- https://www.civilguruji.com/s/store/c...

Download Estimation PDF :- Application me free webinar Course me available hai

Branch Address :
1. DELHI - NCR

Civil Guruji - 25, gate no. 1,
behind kailash hospital
knowledge park -1 Greater noida
(201308)
https://goo.gl/maps/a2TpSDCCGiRYxEb19

2. BHOPAL

Civil Guruji :- at Hind convent school
Naveen Nagar, Bhopal, Madhya
Pradesh 462010

3. LUCKNOW

Civil Guruji :- at Prayag public
school Sandaulli Umarpur ,Near
Juggaur railway station road,
Lucknow 225003


About This Video :-

The 'construction process' (sometimes called the 'construction stage') is the physical processes of building, landscaping or refurbishing plus all the associated activities, such as demolition, site clearance, administration and so on.
The process of calculation of quantities and COST of various items in connection with the construction project is called an estimate. Building a construction step involve in any type of construction is not an easy task; perhaps it requires lots of afford and investment. Although, for building construction requires lots of time and it is tedious work, yet its result is a permanent asset for us. Therefore, care should be taken in building construction process. Before planning, building construction projects must consider important aspects like the purpose of construction, utility, financial proficiency, the demand for work, etc. In BAR BENDING SCHEDULE you will also get to know about different topics namely:
1) What is BAR BENDING SCHEDULE.
2) Advantages of BAR BENDING SCHEDULE.
3) Why we use steel as a Reinforcement Bar.
4) Type of Reinforcement Bar
5) Size & Unit Weight of Bar.
6) Bend Deduction & Value
7) Clear Cover & Effective Cover
8) Values of Clear Cover
9) Standard Codes used for BAR BENDING SCHEDULE.
Billing is the documentary aspect of the work done, through which payments can be made to the person involved in the contract and responsible to complete the work. Incomplete Billing can cause considerable losses to the contractor or the client. Hence, bills should be perfect and self-explanatory at any stage of the work. Bills from the work sites are to be prepared on a standard printed format. Find here the billing engineer roles and responsibilities along with the job description and salary details.

Every organization should maintain certain procedural systems, methods, and norms for preparing bills and forwarding them through the right channels for payments to the client and contractor.
Bills are generally prepared by the client, contractor, sub-contractor and different vendors for their payment and for the proper execution of the works at the sites.

Quantity surveyors are responsible for managing all aspects of the contractual and financial side of construction projects. They help to ensure that the construction project is completed within its projected budget. Quantity surveyors are also hired by contractors to help with the valuation of construction work for the contractor, help with bidding and project budgeting, and the submission of bills to the client.
civil engineering civil engineering basic knowledge what is civil engineering civil engineers

Комментарии

Информация по комментариям в разработке