Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji

  • Civil Engineering Delhi
  • 2020-12-28
  • 793
How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji
Civil GurujiCivil Engineers Training InstituteCivil Practical Site Trainingcivil Engineeringearthworkearthworksestimation of earthwork excavationprocontractor earthwork estimatingearthwork excavationwhat are the work items in substructureearthwork in excavation in foundationwhat is the difference between invoicing and billingwhat are the taking off list for substructural worksis it worth becoming a civil engineerearth excavation of footing
  • ok logo

Скачать How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji

#civilguruji #civilengineerstraininginstitute #practicalsitetraining
How to Perform Excavation According to CPWD Norms?

Call On:- 9111001234

Get Course Details :- http://www.mediafire.com/file/ijjszdo...

Practical Training course & Fee Detail:-    • Видео  

Get Site Practical Training :- https://www.civilguruji.com/s/store/c...

Join COPs :- https://www.civilguruji.com/s/store/c...

Branch Address :-

1.BHOPAL Civil Guruji :- At Hind convent school Naveen Nagar, Bhopal, Madhya Pradesh 462010
https://maps.app.goo.gl/UhHyHpBzNJRYd...

2.DELHI - NCR Civil Guruji - 25, gate no. 1, behind kailash hospital knowledge park -1 Greater noida (201308) Nearest Metro station : Pari Chowk.
https://goo.gl/maps/a2TpSDCCGiRYxEb19

3.LUCKNOW Civil Guruji :- At Prayag public school Sandaulli Umarpur ,Near Juggaur railway station road, Lucknow 225003near goel tower,
https://maps.app.goo.gl/bxWdfd36j9TTE...

4. NAGPUR Civil Gueuji :- Karmaveer Dadasaheb Kannamwar Engineering College KDK College Rd, Opposite Telephone Exchange, Nandanvan, Nagpur, Maharashtra 440009
https://maps.app.goo.gl/URejiAmmVSqjJ...

About This Video :-
In this video Er. Vivek Kumar Pandey discuss about, How the process of earthwork is executed in all kinds of soils, according to CPWD Norms|With complete CPWD specification DSR details.

Burjis: Short pillars of brick/ stone having top surface finished with cement plaster for marking etc.
Formation or Profile: Final shape of the ground after excavation or filling up.
Foul condition: Filthy and unhygienic conditions where physical movements are hampered such as
soil mixed with sewage or night soil.
Lead : All distances shall be measured over the shortest practical route and not necessarily the route
actually taken. Route other than shortest practical route may be considered in cases of unavoidable
circumstances and approved by Engineer-in-charge along with reasons in writing.
Carriage by manual labour shall be reckoned in units of 50 metres or part thereof.
Carriage by animal and mechanical transport shall be reckoned in one km. unit. Distances of 0.5 km. or
more shall be taken as 1 km. and distance of less than 0.5 km. shall be ignored. However, when the
total lead is less than 0.5 km., it will not be ignored but paid for separately in successive stages of 50
metres subject to the condition that the rate worked on this basis does not exceed the rate for initial
lead of 1 km. by mechanical/animal transport.
Lift: The vertical distance for removal with reference to the ground level. The excavation up to 1.5
metres depth below the ground level and depositing the excavated materials upto 1.5 metres above
the ground level are included in the rate of earth work. Lifts inherent in the lead due to ground slope
shall not be paid for.
Deadmen or Tell Tales: Mounds of earth left undisturbed in pits dug out for borrowing earth
Safety rules: Safety rules as laid down by the statutory authority and as provided in National Building
Code (NBC) shall be followed.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]