4K | Double Decker Flyover in Bengaluru

Описание к видео 4K | Double Decker Flyover in Bengaluru

The newly constructed double-decker flyover in Bengaluru is a significant infrastructure project aimed at easing traffic congestion. Here are some key details:

- **Location and Length**: The flyover stretches 5.12 km from Ragigudda to the Central Silk Board junction⁴.
- **Cost**: It was built at a cost of ₹449 crore⁴.
- **Structure**: The flyover features two separate carriageways, each with two lanes. The lower deck is for vehicular traffic, while the upper deck will accommodate a metro line⁵.
- **Traffic Relief**: It aims to provide a signal-free corridor from Ragigudda to HSR Layout and Hosur Road, potentially reducing travel time by over 30%⁴.
- **Current Status**: While the main flyover is operational, some ramps connecting HSR Layout to Ragigudda and BTM Layout are still under construction and are expected to be completed by June 2025⁵.

This project is expected to significantly improve the traffic situation at the notoriously congested Central Silk Board junction.

Have you had a chance to see or use the new flyover yet?

Source:
(1) How will South India’s first double-decker flyover in Bengaluru ease .... https://www.thehindu.com/news/cities/....
(2) South India’s first double-decker flyover opens for public, BMRCL says .... https://indianexpress.com/article/cit....
(3) . https://bing.com/search?q=newly+const....
(4) Double Decker Sandwich.   / doubledeckersandwich  .
(5) Bengaluru: ‘Double-decker flyover has shifted the congestion’. https://www.deccanherald.com/india/ka....
(6) Double-decker flyover opens at Silk Board Junction in Bengaluru .... https://timesofindia.indiatimes.com/c....

Комментарии

Информация по комментариям в разработке