Hello !! My Youtube Family
Hope you enjoy my video. Please do support and if you want to suggest anything then you can comment down below.
Hang out with me on social media:
Instagram: @santoshyadav2535
Email: [email protected]
Delhi–Meerut Regional Rapid Transit System
The Delhi–Meerut Regional Rapid Transit System, also known as Delhi–Meerut RRTS, Delhi–Ghaziabad–Meerut RRTS and coloquially Rapid Rail, is an under-construction and partially operational 82.15 km (51.05 mi)-long semi high-speed rail and regional transit corridor that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut. It is one of the three rapid rail corridors planned under the first phase of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC). Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of ₹30,274 crore (US$3.8 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram
Route of RRTS Station
Station Names : Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai (EPE), Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South, Partapur, Rithani, Shatabdi Nagar, Brahmapuri, Meerut Central, Bhaisali, Begum Pul, MES Colony, Daurli, Meerut North and Modipuram
The Delhi–Meerut Regional Rapid Transit System, also known as Delhi–Meerut RRTS, Delhi–Ghaziabad–Meerut RRTS and coloquially Rapid Rail, is an under-construction and partially operational 82.15 km (51.05 mi)-long semi high-speed rail and regional transit corridor that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut.It is one of the three rapid rail corridors planned under the first phase of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC).
Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of ₹30,274 crore (US$3.8 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram
RRTS Project
RRTS is a new, dedicated, high speed, high capacity, comfortable commuter service connecting regional nodes in NCR. It is different from conventional Railway as it will provide reliable, high frequency, point to point regional travel at high speed along dedicated path way. RRTS is also different from metro as it caters to passengers looking to travel relatively longer distance with fewer stops and at higher speed.
National Capital Region Transport Corporation
National Capital Region Transport Corporation (NCRTC) – a joint venture company of Govt of India and States of Delhi, Haryana, Rajasthan and Uttar Pradesh is mandated for implementing the Regional Rapid Transit System (RRTS) project across the National Capital Region, ensuring a balanced and sustainable urban development through better connectivity and access
#rrts #rrtsupdate #rapidxtrain #rapidx #namobharat #namobharattrain #delhimeerutrrts #journeylights2535
Информация по комментариям в разработке