This lift was installed in 2018 when the extension for Terminal 1 was open and only the lift that has maximum stops up to 1 was open back then. There used to be a temporary corridor from Terminal 1 only leading to the first floor lobby back then.

Manufacturer: Schindler
Floors: B5, B4, B3, B2, B1, 1, 2, 4, 5
Capacity: 36 persons 2450kg
Model: 5500
Year installed: 2018
Rating: 50/50
History: Original, buttons replaced

Camera: Samsung Galaxy S23 Ultra