Why did my Bathroom Remodel Take 13 Years?

Описание к видео Why did my Bathroom Remodel Take 13 Years?

I have finally completed our 13-year bathroom remodel project. We started demoing our basement bathroom just after we moved into our house. We took out the sink and removed most of the drywall. We decided the shower was in okay shape and we left it as it was, although the outside had never been finished. Over the years, I have reinstalled the drywall, replastered, and painted. We also had our plumber put in new fixtures about 5 years ago. It was functional but unfinished. Just recently we decided to finally get this project done. What I needed to do was put a nice wood sill under the window and built some new cabinetry around the hot water heater which is next to the shower. I found some space next to the hot water heater where I could make some cubbies. Then I made a face frame to cover the cubbies and the hot water heater making a nice built-in piece of cabinetry. The cabinetry has three doors that I edge banded with birch plywood edge. I put up new painted poplar trim around the two doors and the shower door. I also finally used the baseboard I've been saving. Now we finally have a basement bathroom that is mostly finished.

Tools used in this project can be found at
http://www.frankmakes.com/​

To see upcoming projects follow me on social media

Patreon
https://www.patreon.com/user?u=16151185​

Instagram
  / ​  

Twitter
  / frankhowarth​  

Facebook
  / frankmakes  


0:00 (introduction)
0:33 (demolition)
3:18 (window sill)
6:33 (cubby cabinet)
16:00 (face frame)
17:15 (door trim)
22:16 (cabinet doors)
29:30 (conclusion)

Комментарии

Информация по комментариям в разработке