Bangalore Chennai Expressway NE-7 Package 3 Status KHF Interchange In NE-7 | Vlog | Kiran Tummala

Описание к видео Bangalore Chennai Expressway NE-7 Package 3 Status KHF Interchange In NE-7 | Vlog | Kiran Tummala

#viral
#india
#development
#kirantummala

Hello Friend
Hope Everyone Is Fine..
Today's Vlog Covers The Bangalore Chennai Expressway NH-7 Bangalore Chennai Expressway NE-7 Package 3 Status


The Bengaluru–Chennai Expressway

The Bengaluru–Chennai Expressway, or National Expressway 7 (NE-7), is an under construction 258 km (160 mi) long, 4-lane wide access-controlled expressway between the cities of Bengaluru, the capital of Karnataka and Chennai, the capital of Tamil Nadu. It will run from Hoskote in Bengaluru Metropolitan Region Development Authority to Sriperumbudur in Chennai Metropolitan Area. It is planned to allow vehicles to reach 120 km/h (75 mph). The road was designated as a National Expressway on 1 January 2021.

Previous Development Vlogs

Timmapuram To Marikavalasa Road Present Status Nh16 To Beach Connecting Road | Vlog | Kiran Tummala
   • Timmapuram To Marikavalasa Road Prese...  

IIM Visakhapatnam Indian Institute Of Management Ghambiram Anandapuram Vizag | Vlog | Kiran Tummala
   • IIM Visakhapatnam Indian Institute Of...  

Sri Venkateswara Swamy Vaari Temple New Road Developments | Pendurthi Vizag | Vlog | Kiran Tummala
   • Sri Venkateswara Swamy Vaari Temple N...  

Mulapeta Greenfield Port Srikakulam | Developments Of Andhra Pradesh | Vlog | Kiran Tummala
   • Mulapeta Greenfield Port  Srikakulam ...  

Port Connecting Highway To Mulapeta Port From Tekkali Development Of Andhra | Vlog | Kiran Tummala
   • Port Connecting Highway To Mulapeta P...  

Vijayawada West Bypass Complete Details | Vijayawada Andhra Developments | Vlog | Kiran Tummala
   • Vijayawada West Bypass Complete Detai...  

Simhachalam Brts Road Work Progress Adavivaram To Gosala Brts Strech Vizag | Vlog | Kiran Tummala
   • Simhachalam Brts Road Work Progress A...  

Bhogapuram International Airport Vizag Work Update As On Feb 2nd 2024 | Vlog | Kiran Tummala
   • Видео  

Inorbit Mall Construction Status And Ap Cm Camp Office Rusikonda Vizag | Vlog | Kiran Tummala
   • Inorbit Mall Construction Status And ...  

New Road Developments In Uttharandhra Tirupati Pendurthi Vizag | Drone View | Vlog | Kiran Tummala
   • New Road Developments In Uttharandhra...  

Big Change In Seethakonda Beach Vizag | Who Did It? Why? Vizag Developments | Vlog | Kiran Tummala
   • Big Change In Seethakonda Beach Vizag...  

Vijayawada West Bypass Complete Details | Vijayawada Andhra Developments | Vlog | Kiran Tummala
   • Vijayawada West Bypass Complete Detai...  

Raipur Express Highway Package 4 Sabbavaram Interchange work | Drone Views | Vlog | Kiran Tummala
   • Raipur Express Highway Package 4 Sabb...  

Anakapalle Double Trumpet Flyover Drone View In Day And Night | Vizag Beauty | Vlog | Kiran Tummala
   • Anakapalle Double Trumpet Flyover Dro...  Khammam Devarapalli Greenfield Highway Update | Khammam Entry | Vlog | Kiran Tummala
   • Khammam Devarapalli Greenfield Highwa...  



I Hope That Im Showing You Beautiful Roads Of Visakhapatnam And Soon Im Going To Show Indian Major Road.

If You Support Me Support Im Going To Show You Evary Wonder In India And In The World.

Follow Me On Instgram
Https://Www.Instagram.Com/Kiran_Tumma...

Follow Me On Twitter
  / kirantummala1  

Follow My Facebook Page
Https://Www.Facebook.Com/Gang45/?Ref=...

I Enjoyed My Trip So Sharing My Experience
A
Hope You All Like And Enjoy My Video.

Thank You For Your Support


Downloaded Bgm From
Youtube Music
Thank You For Your Support

Yours
Kiran Tummala

Комментарии

Информация по комментариям в разработке