4K (Ultra HD) Full View Salal Dam NHPC Reasi Jammu & Kashmir

Описание к видео 4K (Ultra HD) Full View Salal Dam NHPC Reasi Jammu & Kashmir

Publish On 9 July 2021
Salal Hydroelectric Power Station
Country India
Location Jammu and Kashmir
Coordinates 33°08′33″N 74°48′37″ECoordinates: 33°08′33″N 74°48′37″E
Status Operational
Construction began 1970
Opening date 1987
Construction cost ₹ 928.89 crores
Dam and spillways
Type of dam Gravity dam
Impounds Chenab River
Height 113 m ( 370 fit )
Height (foundation) 113 m
Length 487 m
Dam volume 1.45 million m³
Spillways 12
Spillway type Ogee
Spillway capacity 22,500 m³/s
Reservoir
Creates Salal Lake
Total capacity 280.86 million m³
Active capacity Nil
Surface area 3.74 km²
Normal elevation 487.68 m FRL
Power Station
Operator(s) NHPC
Commission date Stage I: 1987
Stage II: 1995
Type Conventional
Hydraulic head 94.5 m (310 ft)
Turbines Stage I: 3 x 115 MW Francis-type
Stage II: 3 x 115 MW Francis-type
Installed capacity Stage I: 345 MW
Stage II: 345 MW
Total: 690 MW
Annual generation 4000 million kWh

Salal Dam Gates Opened As Water Level Rise Due To Heavy Rain

Salal Hydroelectric Power Station, Joytipuram, Reasi, Jammu and Kashmir, India: Salal Hydroelectric Power Station, Stage-I of 345 MW (115X3) and Stage-II of 345 MW (115X3), is constructed on river Chenab (Chandrabhaga in Sanskrit) in the state of Jammu & Kashmir. The project was conceived in 1920. TSXCVBNM,.he feasibility studies on the project commenced in 1961 by the state government of J&K and construction was started in 1970 by Central Hydroelectric Project Control Board under Ministry of Irrigation and Power. In 1978 construction of the projects was entrusted to NHPC on agency basis. After completion of project, it was handed over to NHPC on ownership basis for Operation and Maintenance. Stage-I of the project was commissioned in 1987. First unit of Stage-II of the project was commissioned in 1993, second in 1994 and third in 1995. At the peak of construction, about 12,000 personnel including contractors worked around the clock to complete the project from 1970s to present day, under proper guidance and maintenance of India's most successful company NHPC (NATIONAL HYDROELECTRIC POWER CORPORATION. The project was taken by HCC and various contractors.

Salal Dam Gates Opened As Water Level Rise Due To Heavy Rain
Salal dam gates open
About salal dam
Latest update nhpc
Latest update of salal dam
Famous Dams of J&K
water Leakage in nhpc dam ,Reasi / NHPC Dam Reasi
Jammu & Kashmir: Gates of Salal Dam opened due to rise in silt in the reservoir caused by heavy rain
Hydro Electric Power Station On River Chenab
Salal Dam Chenab
Watch: Gates of Salal Dam on Chenab River opened in J-K
Salal power house
Biggest Dam
Salal Dam Nhpc
Salal Hydroelectric Power Station On River Chenab
Bhaglihar dam
Chutak dam
Nimo bazgo dam
Uri 1 dam
Uri 2 dam
Salal dam
Dul hasti
Pakul Dum dam
Dumkhar Dam
Diamer basha Dam
High electricity producing dam
Beautiful dams
Reasi dam
Chenab dam
Jhelum dam
Kashmir Dam

#salaldamreasi
#salaldam
#salalpowerhouse
#SalalDamNhpc

Комментарии

Информация по комментариям в разработке