APEXISH full mezzanine build

Описание к видео APEXISH full mezzanine build

This video shows almost everything with a big build like this and that's why its so long. The first 85% takes about a week and then the last 15% seems to take forever. They need the main platforms up as the machine arrives but hold off on the handrails until they get the other machinery up on the platforms. Then its handrails, a catwalk in between the two platforms and then sometimes stairs. A big thank you to Mike Howe for helping me out with the onsite install!!
I used .o45 dualshield for all the heavy welding but then i swap over to the mp210 with .o25 hardwire for the handrail material.

Комментарии

Информация по комментариям в разработке