Kharghar Turbhe Tunnel | KTLR | Kharghar Turbhe Link Road Project

Описание к видео Kharghar Turbhe Tunnel | KTLR | Kharghar Turbhe Link Road Project

The Kharghar-Turbhe Tunnel Road project entails the construction of a 1.763 km-long tunnel on the proposed 5.490 km Kharghar-Turbhe Link Road (KTLR), with an estimated expenditure of INR 2,100 Crore. It is slated to be completed within four years from its commencement.

The overall project includes a twin tunnel section spanning approximately 1.8 km under thi Kharghar hills and an elevated viaduct extending 3.4 km, featuring four lanes in both directions. The design incorporates two unidirectional tunnels to ensure optimal safety measures for commuters.

It will start at Sion Panvel highway opposite Juinagar Railway Station, ending at the 30 m-wide existing road junction of Central Park and Gurudwara in Kharghar via Juinagar.



Video Time Stamp with Google Map Location Link-

01:54 Project start point , Kharghar
https://maps.app.goo.gl/4GNYL7aWxo7t7...

02:25 Tunnel Kharghar End
https://maps.app.goo.gl/UBEYtZceb7cJD...

02:59 Tunnel End- Turbhe
https://maps.app.goo.gl/hWeumW2Yp7fzX...

03:05 Connection with Sion Panvel Highway
https://maps.app.goo.gl/3fSp8CneV1ktM...

03:06 Project End Point Turbhe
https://maps.app.goo.gl/6C9xnKcAYDJ5V...



Connect me on-
Twitter-   / jaideepkane  
Instagram-   / ferroequinologist_jaideep  

#kharghar
#khargharnavimumbai

Комментарии

Информация по комментариям в разработке