30KWh Off-grid Back up Battery Pack With Growatt Inverter Setup-SEPLOS PUSUNG Energy Storage System

Описание к видео 30KWh Off-grid Back up Battery Pack With Growatt Inverter Setup-SEPLOS PUSUNG Energy Storage System

SEPLOS PUSUNG is the stackable 48V 100Ah Battery pack for home energy storage systems.

In this video, we'll set up a 30KWh battery system with 6 packs of PUSUNG batteries. The whole process from cell to module, module to pack, pack to the system. Then, the system to inverter setup. The battery system to upper computer system setup.

Watch the video to know the PUSUNG internal structure. And PUSUNG system setup.
And any questions and suggestions, please leave a comment. or contact us at: [email protected].

More information about SEPLOS products:
PUSUNG-S (Stackable) 48V 100Ah Energy Storage Battery Pack: https://bit.ly/3rVhS6l
SUTEN-W (Wall-mount) 48V 100Ah Energy Storage Battery Pack: https://bit.ly/3BylNrh
PUSUNG-R (Rack-mount) 48V 100Ah Energy Storage Battery Pack: https://bit.ly/3iUoKf9
PARA 12V 100Ah Energy Storage Battery Pack: https://bit.ly/3FUA8Re
3.2V 100Ah LiFePO4 prismatic cell: https://bit.ly/3FTYx9v

Background music from bensound: https://www.bensound.com
----------------------------------------------------------------------------------------------------
Get connected with us
Official website: https://www.seplos.com/
Website 2: https://www.seplos.tech
Facebook page:   / seplostechnology  
Instagram:   / seplos_technology  
Pinterest:   / seplos_technology  
Telegram: https://t.me/joinchat/SisDwbzfPLw2NDVl
WA Business: https://wa.me/message/AQKQF2AGRDHIK1
----------------------------------------------------------------------------------------------------
#storagesystemsetup #growattinverter

SEPLOS 48V 100AH PUSUNG-S Battery Pack Installation Timeline:
00:00 Appetizer
00:15 Cell Balancing
00:23 Cell Voltage Testing
01:00 Cell module assembling
01:33 Cell module wiring and fixing
02:18 Front panel Assembling
03:13 Battery Case Installing
03:29 Battery module installing
03:40 Fuse assembling
03:48 Front panel fixing
03:55 Battery Module fixing
04:08 Battery Module Paralleling
04:33 Batttey and BMS Wiring
05:21 Battery cover installing
05:36 PUSUNG Tower stacking
06:22 Battery pack Wiring
07:37 System to inverter setup
09:18 Software monitoring