Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp...

  • Live Facts India
  • 2025-06-06
  • 111
Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp...
baileybeforebridgechamolicollapsescompletiondaysengineerssusputtarakhand
  • ok logo

Скачать Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp... бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp... или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp... бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Uttarakhand: 2.8 Cr Bailey Bridge Collapses Days Before Completion in Chamoli; PWD Engineers Susp...

Negligence led to the collapse of a 2.80 crore under-construction bridge in Chamoli, isolating thousands and triggering official action. On 4 June 2025, a 60-metre-long Bailey bridge under construction in Ratgaon village, Chamoli district, Uttarakhand, collapsed abruptly as workers removed its support structures. The bridge, costing 2.80 crore and spanning the Dhadharbagad stream, fell into the water, cutting off road connectivity for over 4,000 residents. Fortunately, no injuries were reported. The Public Works Department (PWD) has alleged gross negligence by the contractor, filing a formal complaint and registering a case at Tharali police station. In response, the state government has suspended several PWD officials and vowed to hold the contractor financially accountable. Reconstruction work is slated to begin immediately, with officials promising expedited completion before the monsoon season. Negligence and Accountability Under Scrutiny According to PWD officials, the collapse was triggered when the contractors workers simultaneously removed the bridges support structures and tension cables, a critical error that compromised the bridges stability. Assistant Engineer Jagdish Kumar Tamta explained, The supports and tension ropes are meant to be removed in a phased manner. Removing them together caused the bridge to buckle and collapse. District Magistrate Sandeep Tiwari confirmed that an FIR has been lodged against the contractor at Tharali police station, and a show-cause notice has been issued to the chief engineer overseeing the project. Chief Minister Pushkar Singh Dhami has taken a strong stance, suspending three PWD engineers, including Executive Engineer Dinesh Mohan, and asserting that the government will recover the financial loss from the contractor. No one found guilty will be spared, Dhami declared, emphasising the need for accountability in public infrastructure projects. Local residents, while relieved that no casualties occurred, expressed deep frustration and fear over the disruption to daily life, demanding a transparent investigation and swift restoration of the bridge. A Troubled History of Infrastructure Failures This incident is the latest in a series of infrastructure failures in the region, which has historically been vulnerable to natural disasters. The original bridge built in 2013 was destroyed by floods, and a Bailey bridge constructed between 2015 and 2016 was washed away during the devastating 2018 floods that also destroyed homes and shops in the area. The current bridge, sanctioned in early 2024 and under construction for just two months, was intended to restore vital connectivity for the isolated communities of Ratgaon and neighbouring villages. With the monsoon season fast approaching, residents are anxious about being cut off from essential services, markets, and emergency care. The repeated loss of infrastructure has not only hampered economic activities but also eroded trust in the authorities ability to deliver safe and durable public works. The Logical Indians Perspective The recurring collapse of critical infrastructure in Chamoli underscores a pressing need for systemic reforms in project management, oversight, and community involvement. While it is fortunate that no lives were lost in this latest incident, the disruption faced by thousands of residents reveals the human cost of negligence and poor planning. The swift action by the government to suspend officials and pursue legal action against the contractor is a positive step, but it must be accompanied by a culture of transparency, accountability, and empathy that prioritises peoples safety above all else. Sustainable development demands that public infrastructure projects be executed with the highest standards of quality and integrity, ensuring that communities are not repeatedly left vulnerable. How can we, as citizens and stakeholders, advocate for stronger safeguards and participatory governance to prevent such failures in the future? View this post on Instagram Read more: https://thelogicalindian.com/uttarakh... Published at: 2025-06-06 12:25:43 Powered by The World News API (https://worldnewsapi.com/) Background music from WavelayersMusic #uttarakhand #2.8 #bailey #bridge #collapses #days #before #completion #chamoli #engineers #shorts #news

Комментарии

Информация по комментариям в разработке

Похожие видео

  • Uttrakhand News: देहरादून में आम का ट्रक पलटने से मची लूट, देखें वायरल वीडियो
    Uttrakhand News: देहरादून में आम का ट्रक पलटने से मची लूट, देखें वायरल वीडियो
    5 месяцев назад
  • Bailey bridge nears completion | Uttarkashi cloudburst | Uttarakhand | #shorts
    Bailey bridge nears completion | Uttarkashi cloudburst | Uttarakhand | #shorts
    4 месяца назад
  • Uttarakhand News: चमोली में हेलंग डैम साइट पर भारी Landslide | Flood
    Uttarakhand News: चमोली में हेलंग डैम साइट पर भारी Landslide | Flood
    4 месяца назад
  • Inilah tampak puing-puing drone yang mengarah ke rumah Putin
    Inilah tampak puing-puing drone yang mengarah ke rumah Putin
    1 день назад
  • Uttarakhand | Bridge Repair in Full Swing to Restore Highway Connectivity to Harsil
    Uttarakhand | Bridge Repair in Full Swing to Restore Highway Connectivity to Harsil
    4 месяца назад
  • Bailey Bridge का निर्माण कार्य अपने अंतिम चरण में #uttarkashicloudburst  #uttarakhand N18S
    Bailey Bridge का निर्माण कार्य अपने अंतिम चरण में #uttarkashicloudburst #uttarakhand N18S
    4 месяца назад
  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]