Meerut Metro Corridor, USD 6.5 Billion VB Sleeper trainset production begins, Steel Production

Описание к видео Meerut Metro Corridor, USD 6.5 Billion VB Sleeper trainset production begins, Steel Production

Punch Deck - Tempest
   • Punch Deck - Tempest  
   / @punchdeck  
https://open.spotify.com/artist/7kddu...
https://punchdeck.bandcamp.com/
  / punch-deck  
  / punchdeckofficial  
  / punch_deck  

00:00 Introduction
01:00 Bengaluru Metro Phase 2 TBM Breakthrough
01:13 Marathwada Rail Coach Factory (MRCF)
03:05 Ahmednagar-Beed-Parli New Rail Line Project
03:25 Silicon Carbide-based Semiconductor Device Manufacturing Facility
04:11 Saharsa station in Bihar
04:26 260 m PSC Bridge for Bullet Train Project
04:40 Anuppur-Katni 3rd Rail Line
05:00 54 VB Express trains in operation
05:20 Steel Production
05:42 Meerut Metro Corridor
07:20 Freight Loading in Railways

Комментарии

Информация по комментариям в разработке