Partial Discharge Testing of Underground cables | Rugged Monitoring

Описание к видео Partial Discharge Testing of Underground cables | Rugged Monitoring

Testing and monitoring of Partial Discharge are crucial to detect the failures early. PD testing and monitoring are imperative in the insulation of medium voltage (MV) and high voltage (HV) electrical assets. Early detection of Partial Discharge and on time rectification will ensure incessant operations of electrical assets which increases the revenue. #partialdischargetest and monitoring equipment by Rugged Monitoring is designed to operate in all voltage conditions for the following assets:
1. Power Cables (#undergroundcables): Installed along with the cables, joints, terminations, and sealing.
2. Switchgears: Applicable to medium and low voltage metal-clad switchgear.
3. Gas Insulted Switchgears
4. Transformers and Reactors, including dry-type transformers
5. Rotating Machines like Motors and Generators

To more know visit our website: https://bit.ly/3bsOGpp

Комментарии

Информация по комментариям в разработке