Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Collie Battery Energy Storage System Stage 1 | Westforce Construction

  • Westforce Construction
  • 2025-08-30
  • 139
Collie Battery Energy Storage System Stage 1 | Westforce Construction
  • ok logo

Скачать Collie Battery Energy Storage System Stage 1 | Westforce Construction бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Collie Battery Energy Storage System Stage 1 | Westforce Construction или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Collie Battery Energy Storage System Stage 1 | Westforce Construction бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Collie Battery Energy Storage System Stage 1 | Westforce Construction

As part of Synergy’s major push toward decarbonisation, Westforce was selected by SCEE Electrical to deliver the civil and structural works for the Collie Battery Energy Storage System Stage 1 (CBESS1). This landmark project supports the replacement of coal-fired generation with renewable energy storage and represents a major investment in Western Australia’s energy future.

CBESS1 will be one of the largest battery installations globally, capable of delivering up to 500MW of stored energy. It includes 640 containerised batteries and 160 inverters across a site footprint of approximately 40,000m² - more than ten times the size of Synergy’s first Kwinana battery project.

Located next to the Collie Power Station in Palmer, around 200km south of Perth, the site requires precise, large-scale delivery across bulk earthworks, underground services and structural concrete. Westforce is managing all civil components, including preparation for two switch rooms, a control room and the network services provider (NSP) building, alongside major roads, drainage and energy infrastructure.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]