Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Ares I Booster Ground Test (Sept 10,2009)

  • Rodney Anderton
  • 2009-09-15
  • 10239
Ares I  Booster Ground Test (Sept 10,2009)
AresI-XGroundtestsolid-fuelNASA
  • ok logo

Скачать Ares I Booster Ground Test (Sept 10,2009) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Ares I Booster Ground Test (Sept 10,2009) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Ares I Booster Ground Test (Sept 10,2009) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Ares I Booster Ground Test (Sept 10,2009)

Sept 10, 2009 ground test of the Ares I booster.

From ATK Press Release:

Successful Ground Test Paves the Way for the First Flight Test of Ares I-X This Fall

Sep 10, 2009

PROMONTORY, Utah, Sept. 10 /PRNewswire-FirstCall/ -- NASA and Alliant Techsystems (NYSE: ATK) made history today as they conducted the first test of the Ares I first stage five-segment development solid rocket motor, marking the first steps into a new era of space exploration. It is the most powerful and reliable solid rocket booster in the world, and is planned for NASA's Ares I and Ares V rockets.

The initial data showed the motor performed as designed, producing 3.6 million pounds of thrust and burning for over two minutes. The first stage motor for Ares I measures 12 feet in diameter and 154 feet in length. During the test sensors and gauges collected 650 channels of data to accomplish 46 test objectives. The data from this test will help validate how Ares I will perform in flight.

"This test not only validates the design upgrades from the space shuttle program, it is a testament to how NASA and its contractor teams work together to ensure success," said Mike Kahn, executive vice president, ATK Space Systems. "This dedicated and experienced team has sustained a rigorous and disciplined schedule to develop our next-generation crew launch vehicle - which remains within budget and on schedule - culminating four years of progress."

The Ares I first stage has been under development since 2005. Based on the design of the Space Shuttle's four-segment booster, the first stage differs from its predecessor in the addition of a fifth segment, changes to the propellant grain, a larger nozzle opening and upgraded insulation and liner. All of these combined modifications provide higher performance.

"This ground test provides us with valuable operational data to verify our computer models and other design points," said Kahn. "Along with data collected from the Ares I-X flight test this fall, we will further mature the first stage design."

The Ares I first stage cases remain the same as those used for more than three decades on the Space Shuttle Program. The cases used in this ground test have collectively flown on 48 previous shuttle missions, including STS-1, the very first flight.

"Ares I is the safest launch vehicle ever developed. By using shuttle boosters to derive the design of the Ares I first stage we were able to leverage decades of ground tests and shuttle flight processes," said Kahn. "The infrastructure, knowledge and lessons learned that we have transferred to the Ares I first stage program will continue to ensure the success of the human spaceflight program for decades to come."

NASA's Ares I will launch the Orion crew exploration vehicle for missions to the International Space Station and to other destinations beyond low earth orbit (LEO). With a launch abort system, in-line configuration and simple design of one solid rocket motor and one liquid engine, Ares I will be 10 times safer for the crew than any other system.

The successful test followed postponement of a test on August 27 relating to faulty ground testing equipment.

ATK is the prime contractor for the first stage five-segment solid rocket motor and provides the main abort motor and attitude control motor for Orion's Launch Abort system.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]