Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Damaged Wind Turbine - Controlled Demolition, Inc.

  • TheLoizeauxGroupLLC
  • 2022-12-02
  • 277878
Damaged Wind Turbine - Controlled Demolition, Inc.
implosionexplosives demolitionexplosivesdemolitioncontrolled demolitionControlled Demolition Inc.CDILoizeauxYoutubeTexasWind TurbineawesomeextremebestamazingGoProSonyTaft
  • ok logo

Скачать Damaged Wind Turbine - Controlled Demolition, Inc. бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Damaged Wind Turbine - Controlled Demolition, Inc. или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Damaged Wind Turbine - Controlled Demolition, Inc. бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Damaged Wind Turbine - Controlled Demolition, Inc.

In mid-October of 2022, a wind turbine located near Taft, Texas, experienced a thermal event in causing damage to its nacelle and blades. Given the hanging debris from the damaged wind turbine and the condition of the tower, the wind farm owner decided to keep all personnel and investigators away from the damaged unit until a decision was made on how to safely proceed with the damaged structure. Less than a week later, high winds caused the damaged nacelle and blades to fall to grade near the base of the unit, leaving only the 78-meter-tall tower standing. The wind farm owner subsequently determined that the damaged unit was not a candidate for crane dismantling for reasons of duration of exposure to worker safety and looked for an alternative means of bringing the tower down quickly to reduce exposure of the foundation to tower oscillation and for potential reuse of the foundation for a replacement wind turbine unit.

The manufacturer took the lead and contacted CDI directly regarding our ability to fell the 78-meter-tall tower within a 45-degree arc in a direction that would avoid below-grade collection lines and disruption of debris at grade that had not as yet been inspected by consulting engineers/insurers. The goal was to retain use of the existing foundation for rapid erection of a replacement unit. A main demolition contractor was selected to prepare the unit in accordance with CDI’s plan under the supervision of the CDI field representative. CDI felled the tower at 9:37 AM local time in that direction of fall which would not disrupt debris at grade or cause damage to the foundation.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]