Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install

  • AutoX Advice
  • 2021-07-24
  • 1310
Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install
  • ok logo

Скачать Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Product-Review Azor Wilbar 21' Above Ground Saltwater Pool Install

In this video it shows all the steps to install an above ground pool In includes the install of a filter, pump, electrical, pump shed and the other pool items. I use a Waterway Power Defender 140 variable speed pump, a WaterCo Multicyclone 16 Ultra, and a CircuPool SJ20 saltwater chlorinator. The pool is made by the Wilbar Group and is an Azor 21' by 54" all resin pool. The liner is Swinline j-hook 21' X 54" 25 gauge with a 25 year warranty. The pool equipment is all housed in a pool shed to keep it out of the sun and the elements. The pool piping is all hard piped with PVC pipe. Shutoff valves were installed to help with the standard maintenance of cleaning the filters, pump and saltwater chlorinator. The project took around a month to complete of evenings and weekends. The pool install took around a day to complete after the ground was been leveled. Due to Covid19 in 2020 the only item that could be completed is the de-sod and leveling of the ground. A separate 120V GFCI circuit was installed at the main electrical panel and ran to the pool shed.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]