Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule.

  • PORR Deutschland
  • 2023-07-25
  • 119
PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule.
  • ok logo

Скачать PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule. бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule. или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule. бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео PORR Germany: A66 Salzbachtal Bridge - Bridge building for south bridge ahead of schedule.

On 28 March 2023, the fourth and final shunting for the southern Salzbachtal bridge of the A66 in Wiesbaden took place. Originally, the bridge was scheduled to be built at the end of April. But the pace of construction is currently ahead of schedule. The team is working shoulder to shoulder to ensure safe and economical completion so that the southern bridge is available to traffic on schedule at the end of December with two narrowed lanes in the direction of Frankfurt and Rüdesheim.

"We are working here as a team on an equal footing. The cooperation with Autobahn GmbH as the client and our ARGE partner Plauen Stahl Technologie GmbH works smoothly hand in hand - that's fun and the result shows that we are shoulder to shoulder and passionate about the job," says Markus Jahn, project manager.
The more complex and larger a construction project, the higher the risk of accidents on the construction site. The Salzbachtal Bridge project shows that this thesis does not have to be true: 426 days the construction site was accident-free at the time the bridge was built - even without a cut.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]