Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Next Generation Jammer Mid Band takes to the skies for Growler flight testing

  • Oreaco
  • 2020-09-03
  • 1079
Next Generation Jammer Mid Band takes to the skies for Growler flight testing
SteelGuru Business NewsOnline NewsDefense NewsAerospace NewsUS Air ForceRaytheonJammer Mid BandEA-18G Growler
  • ok logo

Скачать Next Generation Jammer Mid Band takes to the skies for Growler flight testing бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Next Generation Jammer Mid Band takes to the skies for Growler flight testing или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Next Generation Jammer Mid Band takes to the skies for Growler flight testing бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Next Generation Jammer Mid Band takes to the skies for Growler flight testing

#RaytheonTech #JammerMidBand #EA18GGrowler

Raytheon Intelligence & Spaces Next Generation Jammer Mid Band flew on an EA-18G Growler its first flight test on the aircraft. The US Navy's NGJ-MB is an advanced electronic attack system that denies, disrupts and degrades enemy technology, including communication tools and air-defense systems.

After hundreds of hours of successful ground and chamber testing, the first flight took place on August 7, 2020, at the Naval Air Station Patuxent River in Maryland meeting all objectives. Future mission systems flight testing will demonstrate weapons system control, power generation, and electromagnetic compatibility between jammer and aircraft, as well as the performance of NGJ-MB's high-capacity digital waveform generation and active electronically scanned arrays in flight against a variety of targets. Data from these flight tests on the Growler will inform Milestone C the Navy's decision to start NGJ-MB production.

The flight follows more than 600 hours of ground testing of Engineering Development Model, or EDM, pods. At the Naval Air Stations Patuxent River and at Point Mugu in California, EDM pods underwent anechoic chamber testing a special facility designed to absorb electromagnetic waves to measure the jammer's radio frequency power and beam-steering capabilities.

In addition to mission systems testing, the program is expected to begin aeromechanical flight testing shortly to assess aircraft flying qualities and performance, following previously completed ground vibration, static load, and wind tunnel testing. These tests will also evaluate the effects of the air flow environment on the pod, as well as noise and vibration behavior. To date, RI&S has delivered 10 EDM pods: six mission systems pods and four aeromechanical pods. A total of 28 pods will be delivered under the EMD contract.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]