Ito Na Ba Ang Sagot Sa Mga Pagbaha Sa Cavite?

Описание к видео Ito Na Ba Ang Sagot Sa Mga Pagbaha Sa Cavite?

The construction of the Imus retarding basin has a detention pond area of about 35 hectares while Bacoor retarding basin has two temporary storage pond or basin connected by sluiceway for a total area of 9 hectares to contain floodwaters during a storm and reduce the peak volume of flood flow in Imus River and Bacoor River.

#buildbuildbuildproject
#jica
#retardingbasin

Комментарии

Информация по комментариям в разработке