Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Green Tree Borough Greentree Rd (SINC-UP) Project Summary

  • Southwestern Pennsylvania Commission
  • 2020-03-26
  • 66
Green Tree Borough Greentree Rd (SINC-UP) Project Summary
  • ok logo

Скачать Green Tree Borough Greentree Rd (SINC-UP) Project Summary бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Green Tree Borough Greentree Rd (SINC-UP) Project Summary или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Green Tree Borough Greentree Rd (SINC-UP) Project Summary бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Green Tree Borough Greentree Rd (SINC-UP) Project Summary

View the Project Summary here: https://www.spcregion.org/wo11_green-...

The Greentree Borough Signals In Coordination with Equipment Upgrades (SINC-UP) Project is a traffic signal project with the goal of optimizing signal operations at intersections along the Greentree Rd (SR 121) corridor while considering all users of the intersections.

As part of this project, many intersections received new signal controllers and/or cabinet assemblies, battery backup and/or electrical services, and emergency vehicle preemption. Ethernet Radios and/or Global Positioning Satellite antenna and receivers were installed at the intersections to allow for coordination. Coordination of traffic signal is one of the most cost effective ways of improving traffic flow along a corridor.

The results showed the average PM Peak travel time improved over 20%. On average, southbound stops improved by 50% during the weekday peaks.

Learn more at https://www.spcregion.org!

  / spcregion  
  / spcregion  

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]