Setting up a new Evo Downtube

Описание к видео Setting up a new Evo Downtube

Unboxing and setting up a brand new downtube for an Evo Shearing Plant.

• Firstly, remove the downtube from the packaging and check to ensure no transportation damage has occurred.
• Remove the plastic cover from the end of the downtube.
• Ensure that this hole is located just below the ferrule before continuing.
• Insert a screwdriver into the hole and unscrew the cog from the end.
• Slide the short tube assembly onto the long tube assembly, lubricating with oil.
• Reinstall the cog that was removed to secure the short tube assembly in place.
• Remove the screwdriver from the hole, add some oil and screw the ferrule in place.
• Once done, tighten by using a pair of vice grips on the tip section only, never tighten from below this area.
• Next, generously lubricate the downtube.
• Your new downtube is now ready for installation!
• Insert the downtube into the Evo and ensure this light sits flush within the sleeve.
• The Evo may need to be switched on and off to allow the downtube to be raised into position.
• Once in position, clamp it in place.

Heiniger Australia: https://www.heiniger.com.au
Heiniger New Zealand: https://www.heiniger.co.nz

Комментарии

Информация по комментариям в разработке