Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 11. CQMC Podcast: Documentation

  • Construction Tutor
  • 2025-12-16
  • 0
11. CQMC Podcast: Documentation
Contractor Quality Control ReportCQC ReportQA Reportdocumentationrecord keepingRMSNASpreparatory phaseinitial phasefollow-up phasecorrective actionsafety evaluationssubmittalsoff-site surveillanceQC Managerverification statementlitigation supportperformance ratingthree-phase controldaily reportingmutual understanding meetingpattern detectionmaterial receptionequipment statusobjective reportingcontract requirements
  • ok logo

Скачать 11. CQMC Podcast: Documentation бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 11. CQMC Podcast: Documentation или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 11. CQMC Podcast: Documentation бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 11. CQMC Podcast: Documentation

This video is a podcast-style "deep dive" into Module 11: Documentation (referred to as Submodule 6.3 in the source material). The hosts emphasize the legal and financial importance of the Contractor Quality Control (CQC) Report, describing it as an "indispensable quality management tool" that serves as the project's legal record. They detail the 11 required elements of the report (including work performed, tests, deficiencies, and safety), explain the difference between the CQC report (Contractor's story) and the Quality Assurance (QA) Report (Government's audit), and stress that the QA report is private to the government. The episode also includes a practical workshop where the hosts critique and rewrite vague report entries to make them contractually sound.

Timings

[00:00] Introduction to Documentation as a "powerful tool" and legal necessity.

[02:15] Key Systems: RMS (Record Management), NAS (Network Analysis/Schedule), and Three-Phase Control.

[04:00] Why document? Early warning system, performance ratings, and "litigation anchor."

[07:50] The CQC Report: Daily submission requirement and 11 major elements.

[09:15] Accountability Elements (1-3): Contractor ID, Equipment Status, Work Performed.

[10:50] Control Elements (4-6): Tests/Control Activities (PIF), Materials Received, Submittals.

[13:45] External/Admin Elements (7-11): Off-site surveillance, Safety, Instructions, Attachments, Verification.

[16:10] The Government QA Report: Assurance role, separation from CQC, and why it's private.

[20:00] Good Practices: Specificity, PIF linkage, and "closed loop" deficiency tracking.

[23:20] Workshop Scenario 1: Critiquing "Everything looked okay" (Inadequate).

[24:55] Workshop Scenario 2: Rewriting vague comments into a specific, actionable entry.

[27:15] Workshop Scenario 3: Sub-reports and the need for follow-up control evidence.

[31:00] Workshop Scenario 4: Initial Phase report for Ceramic Tile (Attendees, Checks, Authorization).

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]