Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton

  • HeliconUSA
  • 2019-10-22
  • 4351
Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton
TampaFloridaHiltonHome 2 SuitesHeliconGround ImprovementPre-ConstructionVibroVibro Stone COlumnsvibro replacementvibro compactionfoundation
  • ok logo

Скачать Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Vibro Stone Columns Project Highlight: Home 2 Suites by Hilton

Helicon Project: Vibro Stone Columns, Home 2 Suites by Hilton, Tampa, FL
Client: Craft Construction
Market: Commercial
Technical Details:
Helicon's vibro stone columns (or vibro-replacement) are a ground improvement technique particularly suitable to increase the density of granular soils and reinforce cohesive soils.

The Project: Home 2 Suites Hotel (Craft Construction)
The project is a new hotel located on W. Laurel Street, Tampa, Hillsborough County. The structure is a
6‐story, approximate 11,000 square‐footprint building, stormwater vault, pool, and associated parking & drive areas. Due to presence of loose sands & soft clay layers in the upper 20 feet, we utilized a Dry
Bottom Feed (DBF) installation method for our Vibro‐Replacement Stone Column (VSC) program to
provide an allowable net bearing capacity of 6,000 psf.
Challenges:
The challenges encountered during VSC installation were minimal:
 Limited movement around the site, due to multiple trades
 Weather conditions were unfavorable and slowed production
The Solution:
Helicon’s design engineer followed the requirements of the Geotechnical Engineer of Record, in order to create the VSC program to install depths of 15 feet. Helicon’s VSC crew worked 10‐hour shifts for 5 days a week, in order to complete the program. Efficient planning & coordination was key to overcoming the challenges & limitations. (284) Vibro‐Replacement Stone Columns (VSC) were installed from site grade to the prescribed depths and a single column modulus test was performed for verification. The project was completed within (2) weeks and within budget.

For more information please visit www.heliconusa.com or call 844-HELICON.

Vibro Stone Columns
Vibro Replacement
Vibro Compaction
Pre-Construction
Foundation
Tampa, FL

Комментарии

Информация по комментариям в разработке

Похожие видео

  • Vibro Compaction Replacement (Top Feeder)
    Vibro Compaction Replacement (Top Feeder)
    10 лет назад
  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]