Maine Cabin Build Ep.8 | Logs |Foundation Drain | Backfill |

Описание к видео Maine Cabin Build Ep.8 | Logs |Foundation Drain | Backfill |

We had good weather and was able to get a good bit done. We got the perimeter tile done and backfilled, all sill logs are now on and started putting logs up for the walls. The basement access hole is now cut out and floor supported . You will see the logs scribed then notched.

Комментарии

Информация по комментариям в разработке