They built an AWESOME Cement Floor in San Jose, Costa Rica

Описание к видео They built an AWESOME Cement Floor in San Jose, Costa Rica

Pouring a cement floor for a new building involves several steps to ensure a solid foundation. Here’s a basic overview:
Preparation:
Excavation and Form Building: Excavate the area where the floor will be poured. Build forms using straight boards (2x12 for thickened edges or 2x6 for slabs without thickened edges).
Vapor Barrier: Install a vapor barrier to prevent moisture from rising through the concrete.
Reinforcement: Add rebar at 2ft x 2ft centers to reinforce the slab.
Pouring the Concrete:
Order Ready-Mix Concrete: Call to order ready-mix concrete based on your slab dimensions.
Place, Screed, and Bull Float: Pour the concrete into the forms, level it using a screed board, and then use a bull float to smooth the surface.
Control Joints: Create control joints every 5-6 feet with a groover to prevent cracking.
Finishing:
Edging: Use an edger to create a neat edge around the slab.
Curing: Allow the concrete to cure for at least three days.
Maintenance: Regularly maintain the concrete to ensure its longevity.
Remember to check local building codes and obtain any necessary permits before starting the project.
#cement #building #costarica