PEMA WS2 Platform | LSO Tandem welding

Описание к видео PEMA WS2 Platform | LSO Tandem welding

One of the most efficient ways to weld with the PEMA platform and multiple joints simultaneously is with a tandem long stick-out process combined with the in-house designed software PEMA Weldcontrol 500 software. The PEMA WS2 platform is a perfect solution for wind tower manufacturers. It makes the welding process efficient, saves time, and reduces the need for manual labor.

A challenge in wind tower production is that to produce large-diameter tubular structures two to three smaller plates need to be joined together to create one large plate. A solution is to weld with narrow or semi-narrow grooves which saves time, resources, and energy
and result in high quality and safety.

The long-stick-out process by Pemamek is suitable for heavy tubular production, such as offshore wind towers and foundations. It radically increases the deposition rate compared to the tandem process, also the wire feed speed increases due to longer stick-out and pre-heated wire.

Learn more about the PEMA solutions for wind energy:
https://pemamek.com/welding-solutions...

Follow us on social media:
  / pemawelding  
  / pemamek  
  / pemawelding  

Комментарии

Информация по комментариям в разработке