Montrose BLP topside for Repsol Sinopec

Описание к видео Montrose BLP topside for Repsol Sinopec

The Montrose Bridge Linked Platform was constructed at Heerema Zwijndrecht. The construction of the topside started in March 2013 and was completed within three years.

End April 2016 the project was transported to the offshore location and installed by HMC's crane vessel Thialf.

Комментарии

Информация по комментариям в разработке