Nagdhunga Tunnel Construction Project new update | Balambu flyover to Nagdunga Entry road

Описание к видео Nagdhunga Tunnel Construction Project new update | Balambu flyover to Nagdunga Entry road

In this video, I will give detailed information about the road from Nagadhunga to Balambu flyover.
According to the news, the physical progress of the Nagadhunga-Sisnekhola tunnel has reached 80.5 percent in four years since its construction. At present, the construction work of the flyover at Balambu in Kathmandu is in full swing.
A flyover is being constructed at KCPD at Balambu to connect the Balambu-Sisnekhola tunnel with the Tribhuvan highway. A flyover is being constructed here as there may be a traffic jam when the vehicle turns from the highway to the tunnel. The length of this flyover will be 128 meters and the width will be 7 meters.
The construction of the tunnel was carried out by the Japanese company Hazma Endo Corporation. is doing 16 and a half of Japan in this project, which has a contract of 22 billion rupees. Billion rupees loan assistance. The Government of Nepal has invested 6 billion rupees in this. The distance of the main tunnel is 2.688 km.

Check out our channel here:
   / @indoeurotraveller  

Don’t forget to Like and subscribe!

CHECK OUT OUR OTHER VIDEOS
Budhanilkant Temple -    • Budhanilkantha Temple || Budhanilkant...  
Patan Durbar -    • Patan Durbar Square | Krishna Mandir ...  
Kathmandu Nijgadh Fastrack -    • Fasttrack Nepal | Latest update on Pa...  
Kathmandu to India in 5 Hour Series -    • Nepal to India by Road ||  Kathmandu ...  
Kathmandu Nigadah Fastrack Tunnel Series -    • Kathmandu Nijgadh Fast Track | Fast T...  

This is a free channel and it's for traveling purposes
   / @indoeurotraveller  

Don’t forget to Like and subscribe!

Audio Credit
@AudioLibraryEN

Комментарии

Информация по комментариям в разработке